Delaware.gov logo
Listen to this page using ReadSpeaker

 Pages Tagged With: "boat lift"

Federal Consistency Determination: Ewing Docking Facility

The applicant proposes to use an Army Corps of Engineers Individual Permit for construction of a pier, a dock, a boat lift and two mooring pilings in the Indian River at 31426 River Road, in Millsboro.


Federal Consistency Certification: Burkentine Docking Facility

The applicant proposes to construct a pier, a dock and two boat lifts adjacent to the Lewes and Rehoboth Canal at 55 Thompson Court, Canal Corkran, Rehoboth Beach.


Federal Consistency Certification: Paese-Kimbrough Docking Facilities

The applicants propose to build docking facilities consisting of an elevated walkway over vegetated wetlands, a fixed pier, a fixed dock, and a boat lift on the Lewes and Rehoboth Canal, in Lewes.


Federal Consistency Certification: Paese Dock and Pier

The applicant proposes to dredge a portion of the Lewes and Rehoboth Canal and build a fixed pier, fixed dock, boat lift, gangway, floating dock and a wetland walkway.


Federal Consistency Certification: Reed Docking Facilities

The applicant proposes to remove two existing fixed piers and to build a new fixed pier with a boat lift, including two catwalks, and to build a fixed pier with a double PWC lift, including three catwalks, at 201 Anglers Road, Lewes.





+