Delaware.gov logo

Wetlands and Subaqueous Lands Applications



Division of Water

Published: Sept. 2, 2020
Comments Due: Sept. 22, 2020

Subaqueous Lands Permit and Wetlands Application

Robert McLaughlin (235-4.17-10.00) – To construct a 3 by 165 foot wetland walkway in Deep Hole Creek at 104 Jefferson Ave. Broad Kill Beach in Milton, Sussex County, DE

Delaware Department of Transportation (0704340054) – To temporarily impact up to 7,068 square feet of state-regulated wetlands and subaqueous lands for roadway resurfacing and construction access at bridge 1-746 conveying I-95 over Little Mill Creek in New Castle County, DE

Subaqueous Lands Permit Applications

Karen Zajick & Jennifer Weeks (334-19.00-329.00) – To construct a 4 by 25 foot long pier, a 6 by 40 foot long dock, a 6 by 12 foot long floating dock, a boat lift with 4 associated pilings and two (2) PWC lifts with one associated piling each located in Bald Eagle Canal at 81 Blackpool Rd, Rehoboth Beach Yacht and Country Club, Rehoboth Beach, Sussex County, DE 

Mary Beth Hall (533-6.00-65.00) – To construct a road crossing by placing a 30 foot long, 42-inch diameter culvert pipe, 12 cubic yards of fill in Prong 9, located south of the Daisy Road and Rickards Road intersection, Frankford, Sussex County, DE

DE Land Investments 2, LLC (134-19.00-115.02 & 134-21.00-8.00, 134-21.00-11.00) – To remove two (2) existing 86 foot long, 36-inch diameter culvert and replace it with two (2) 86 foot long, 36-inch diameter culvert pipes, and place 170 cubic yards of fill, and 461 cubic yards of fill in Prong 1 of the Williams Canal Tax Ditch, located at Estuary Boulevard, Frankford, Sussex County, DE

Delaware Department of Transportation (2601340075) – To rehabilitate existing concrete bridge piers, resulting in approximately 8,378 square feet of temporary subaqueous impacts at bridge 1-759 conveying I-95 over Brandywine Creek in New Castle County, DE

Division of Watershed Stewardship (3-35-4.00-5.00) – To construct a 4 by 20 foot long fixed pier, a 4 by 15 foot long gangway connecting to a 8 by 22 foot long floating dock and to install a 16 by 40 foot long geogrid boat ramp in the Broadkill River at 901 Pilottown Road, Lewes, Sussex County, DE

Subaqueous Lands Lease Application

Donald F. Gordon, Jr. and Carolyn Gordon (233-7.00-105.00) To construct a boat lift with 4 associated pilings and utilize the existing 4 by 50 foot long pier and 5 by 33 foot long dock located in Pepper Creek at 114 Riverview Dr., Dagsboro, Sussex County, DE 

Alex and Marlena Dinkels (1-34-7.00-101.00) – To install a 40 inch wide by 10 foot long gangway and a 6 by 20 foot long floating platform for launching kayaks and SUP on Pepper Creek, at 29766 Seagrass Court, Dagsboro, Sussex County, DE

Richard and Sharon Robinson (1-34-23.12-2300.00-0000) – To maintain a 5 by 20 foot long dock in Little Assawoman Bay at 1211 N. Schulz Road, Fenwick Island, Sussex County, DE

Subaqueous Lands Lease Supplement Application

Arlan & Patricia Christ and Brad & Tara Scheller- (2-34-34.12-65.00) – To construct three (3) boatlifts with four (4) associated pilings each to an existing structure in the Indian River at 32566 River Road, Millsboro, Sussex County, DE

Gregory & Rachael Cartwright (1-32-6.00-3.00) – To install two (2) 5 by 14 foot long floating PWC docks connecting to a previously authorized structure in the Nanticoke River at 7465 Rivershore Drive, Seaford, Sussex County, DE

Subaqueous Lands Permit and Water Quality Application

Brandywine Shad 2020 (0614300001, 2600640050, 0612700002, 2600620041, 0612600002, #2600540002) – To remove dams number 3, 4, and 6 on the Brandywine River, City of Wilmington, New Castle County, DE

These Documents/Applications above are available for review by contacting:

Wetlands and Subaqueous Lands Section
89 Kings Highway
Dover, DE 19901
302-739-9943

If you have any comments, please return this memo to this office by September 22, 2020.

A public hearing on the above applications will NOT be held unless the Secretary of DNREC determines that a public hearing is in the public interest or if a written meritorious objection to the application is received within 20 days from this notice. Please indicate in your letter whether your intention is to request a public hearing or whether you are simply providing comments for the Department’s consideration. If a public hearing is desired, please be advised that a public hearing request shall be deemed meritorious if it exhibits familiarity with the application and provides a reasoned statement of the action’s probable impact.




+